Road slope staking, Road slope staking – screen two – Spectra Precision Survey Pro CE v3.6 User Manual User Manual
Page 378
Roads Menu
R-221
Road Slope Staking
5RDGV 6ORSH 6WDNLQJ
The Road Slope Staking screen is used to locate the catch point of the
road at any station.
7DS 5RDG« : opens the Tap on a Road screen
where you can tap on any road in the job to
select it.
Name
: displays the name of the selected road.
Begin
Station
: displays the station assigned to
the beginning of the road.
End
Station
: displays the final station in the
road.
%DFNVLJKW« : accesses the Backsight Setup
screen (Page R-72).
1H[W ! : takes you to the next Road Slope Staking screen where the
slope staking parameters are set up.
Road Slope Staking – Screen Two
The second Road Slope Staking screen is used to
set up some slope stake parameters prior to
slope staking the road.
Station
: is the station to be slope staked.
Station Interval
: specifies how far to advance
from the current station to the next station.
1H[W 6WDWLRQ : advances the current station by
the
Station Interval
.