Traverse now or later? dialog box, New occupy point dialog box – Spectra Precision Survey Pro CE v3.6 User Manual User Manual
Page 234
Survey Menu
R-77
Traverse Now or Later? Dialog Box
After taking a shot with the
7UDYHUVH button, the
Traverse Now or Later? dialog box will open where you
can specify if you want to traverse now or later .
7UDYHUVH 1RZ : expects you to move your total station
to the next occupy point before any additional shots
are taken. The occupy, foresight, and backsight points
will be updated accordingly.
7UDYHUVH /DWHU : allows you to take additional side shots before
moving the total station to the next traverse point. This is useful is
you want to take side shots from the current occupy point, but
perform the traverse shot as the first shot of the current set up to
ensure the highest accuracy.
When you have finished taking side shots, tap the
7UDYHUVH button
again. You can then select
7UDYHUVH 1RZ and set up on the next
occupy point, or select
6KRRW 1HZ 7UDYHUVH to re-shoot the traverse
shot.
New Occupy Point Dialog Box
After traversing to a new point, the New Occupy
Point dialog box will open that informs you of
the points that have been updated and
computes the azimuth to the new backsight.
New Backsight Circle
: displays the horizontal
angle that should be displayed on the total
station once it is set up over the
New Occupy
Point
and facing the
New Backsight Point
. This
angle is typically zero unless you are surveying
in true azimuths, as set in the Surveying
Settings screen (Page R-32).
Height of Instrument
: is the new height that the total station is above
the ground.