beautypg.com

Control wiring connections – Rockwell Automation 7000L PowerFlex 7000 Medium Voltage AC Drive C Frame - Marine User Manual

Page 47

background image

Drive Installation 2-17

7000 “C” Frame - Marine

7000L-UM302B-EN-P – June 2013


Refer to Electrical Drawings and wiring diagrams supplied with
Drive. Contact Rockwell Automation representative for assistance.
Final wiring connections to be performed by Rockwell Automation
field service representative.

1. Remove the wireway covers located on top of the line and motor

filter capacitor sections and the DC Link section.

2. If drive has strip heater wiring, it will be coiled up in the top

wireway. Route these wires down through the grommeted cutout for
connection on the terminal blocks located in the upper left side of the
capacitor section.

Figure 2.19 – Strip heater terminal block

3. Route the control wiring which has been coiled up and left hanging

in the upper area of the motor filter capacitor section, back up through
the two grommeted cutouts back into the wireway. There is a fiber
optic cable in this bundle and care must be taken not to damage it.
The fiber optic cable, control power wires and the “XIO link” cable
will be required in the pump control cabinet.

Figure 2.20 – Control Wiring

Control Wiring

Connections