beautypg.com

Grass Valley K2 Storage System Instruction Manual v.3.3 User Manual

Page 45

background image

June 25, 2009

K2 Storage System Instruction Manual

45

Setting up the Level 10 Gig E switch

port number) 1 Gig port in the list.

e. Right-arrow over to the Group column.

f. Use the Space bar and set the bottom 1 Gig port to

Trk1

.

g. Set the next port up also to

Trk1

.

h. Set the next port up also to

Trk1

.

i. Press

Enter

, then right-arrow to

Save

. Press

Enter

and revert to previous menu.

26.Select

Return to Main Menu

and press

Enter

.

27.From the main menu, tab to

Command Line (CLI)

and press

Enter

. The command

prompt appears.

28.Check the version of firmware currently installed on the switch. Type the

following, then press

Enter

:

show flash

Information is displayed similar to the following example:

HP_iSCSI_switch1# show flash

Image Size(Bytes) Date Version

----- ---------- -------- -------

Primary Image : 6737518 07/25/08 T.13.23

Secondary Image : 5886358 10/26/06 T.11.12

Boot Rom Version: K.12.12

Current Boot : Primary

29.Check the Primary Image Version and refer to your K2 Release Notes for

information about currently supported versions. Then proceed as follows:

• If K2 Release Notes instruct you to change the firmware on the switch, do so

before continuing. Refer to the documentation you received with the switch for
instructions to change the firmware. Then continue with the next procedure.

• If K2 Release Notes confirm that the version on the switch is a currently

supported version, continue with the next procedure.

30.Type the following, then press

Enter

:

menu

The main menu opens.

31.From the main menu, choose

Reboot Switch

and press

Enter

. When prompted

“Continue Reboot…?', answer yes (press the y key) to proceed. The switch restarts.

32.You can now use the switch’s web browser interface for further configuration, as

instructed in the next procedure.

33.Close the PC terminal program and disconnect the console cable.

Continue with the next procedure

“Configuring the GigE switch via the Web

interface”

.