Dell PowerVault ML6000 User Manual
Page 258

Chapter 12 Installing, Removing, and Replacing
Adding 9U Library Expansion Modules to an Existing Library
Dell PowerVault ML6000 User’s Guide
258
4
If your library contains FC I/O blades, install both the I/O blades
and the accompanying fan blades in the expansion module. For
Adding, Removing, and Replacing the FC I/O Fan
5
Add the power supplies.For details, see
6
Connect all power cords, network data cables, and module-to-
module cables. Make sure the module terminators are installed at the
top and bottom of the stack of modules. For cabling instructions, see
7
Power on the library. For libraries larger than a ML6020, boot time
may take 15-20 minutes.
8
Configure the library using the
Setup Wizard
that appears on the
operator panel interface.
9
Add the tape cartridges to the library’s modules using the I/E station
commands from the operator panel or Web client.
10
Open the host application and reinventory in order to synchronize its
logical inventory with the physical inventory of the library.
Adding 9U Library Expansion Modules to an Existing
Library
Adding 9U Library Expansion Modules to the library increases the
number of data cartridges available within the library system. These
instructions explain how to add a 9U Library Expansion Module to an
existing library.