Tools for installing your panelview 1200e terminal, Mounting options for panelview 1200e terminals – Rockwell Automation 2711E-xxxx User Manual PanelView 1000e, 1200e 1400e User Manual
Page 55

3–5
Installing PanelView 1200e Terminals
Publication 2711E-6.17 – November 1998
You need the following tools to make a wall or panel cutout and
install a PanelView 1200e terminal in it. The terminal shipment
includes a terminal cutout template for your use.
Note: Conversions of metric/U.S. imperial values may have been
rounded off and therefore may not be exact conversions. This applies
to the dimensions specified in the drawings in this document.
To make a wall or panel cutout, you need these tools:
•
center punch
•
scriber
•
hammer
•
power jig saw
•
set of drill bits (1/8 to 3/8 inch)
•
metal ruler for drawing lines on the panel
•
power drill
•
metal file
To install the terminal, you need these tools:
•
3/8-inch socket drivers
•
11/32-inch socket drivers
•
a minimum 14-inch extension rod
•
ratchet screwdriver
•
slot screwdriver (for clip-mount only)
You can mount your PanelView 1200e terminal in a rectangular
cutout in a panel or wall or in a 19-inch rack. Depending on the
model, the terminals are mounted with mounting studs or mounting
clips.
Note: When choosing a location in which to install the PanelView
terminal, we recommend you provide at least three inches (8 cm)
clearance around the sides and rear of the terminal. Leave at least six
inches (15 cm) clearance from the bottom of the terminal’s logic
board drawer, so you can open the logic board drawer without
removing the terminal from the panel or rack in which it is installed.
Tools for Installing Your
PanelView 1200e Terminal
"
Mounting Options for
PanelView 1200e
Terminals
"