beautypg.com

Quarter-bridge configuration – MTS FlexTest Models 200 User Manual

Page 150

background image

MTS FlexTest® Models 40/60/100/200 Controller Hardware

Digital Universal Conditioner Mezzanine Cards

Mezzanine Cards

150

Quarter-bridge

configuration

The following figure shows a quarter-bridge configuration. In this
configuration, one half of the bridge resides on the DUC card.

When a quarter-bridge transducer is used, a bridge-completion resistor
(R Completion) is required. The bridge-completion resistor is installed on
the I/O carrier board. Once installed, you must physically set switch SW1A
on the card to connect one end of R Completion to -FBR.

R

Shunt

I/O Carrier Board

Transducer

RJ-50

Cable

Plug

2

1

Cable

Shield

3

Cable Grounding

1 The cable shield connects to the metal

shielding on the RJ-50 cable plug.

2 The cable plug shielding connects to the

I/O carrier board body.

3 The I/O carrier board body connects to

earth ground through the chassis.

DUC

A to D

SW1B

+Ex Sense

-Ex Sense

R

Completion

- Excitation

SW1A

Front-Panel

RJ-50

Connector

+FBR

+Excitation

+FB

-FB

-FBR

6

4

7

5

2

IEEE

1451.4

Circuit

1

10

+ IEEE 1451.4 Class 2

- IEEE 1451.4 Class 2

Wagner

Voltage

Source