Installing the instrument and plug-in cards – Fairbanks X SERIES PR 5410 Process Indicator User Manual
Page 19
Section 3: Installing the Instrument and Plug-In Cards
10/08 19
51207 Revision 1
3
Installing the Instrument and Plug-in Cards
Before starting work, please read Chapter 1 and follow all instructions.
Further procedures:
•
Check the consignment: unpack the components specific to the application.
•
Safety check: inspect all components for damage.
•
Make sure the on-site installation is correct and complete including cables, e.g. power cable fuse
protection, load cells, cable junction box, data cable, console/cabinet, etc.
•
Follow the instructions for installation of the unit relating to application, safety, ventilation, sealing
and environmental influences).
•
If necessary, mount the plug-in cards (instrument must be disconnected from all voltage
sources).
•
Connect the cable from cable junction box or platform/load cell.
•
If applicable: connect other data cables, power cable, etc.
•
Connect the instrument power cable.
•
Check the installation.
3.1 M
ECHANICAL
P
REPARATION
For cabinet or panel mounting, a corresponding cut-out for the housing must be provided (see
Chapter 2.2).
Have all required parts, technical documents and tools at hand for mounting. Secure the cable at
the place of installation; e.g., using cable ties. Remove the insulation from the cable ends, keep the
strands short and fit them with ferrules.
3.2 H
ARDWARE
C
ONSTRUCTION
The electronics are contained on two printed circuit boards: the main board and the display board.
The display board is connected to the main board by a
plug.
3.3 M
AIN
B
OARD
The lithium battery (under the
cover for the power supply) is
always activated and energizes
the calendar/clock module.
The main board holds the power
supply and Slots 1, 2 and 4 for
additional cards.
Load cell connector, serial
interface, LAN adaptor, CAL
switch as well as 3 inputs and
outputs are accessible on the
back panel.
Load cell
connector
RS-232
LAN
CAL
3 inputs
3 outputs