beautypg.com

Changing the pump and izs dust filters, Changing the izs permeation tube – Teledyne 9110E - Nitrogen Oxides Analyzer User Manual

Page 166

background image

Instrument Maintenance

Model 9110E Instruction Manual

152

M9110E Rev B

locations). A pump rebuild kit is available from the factory. Appendix B of this manual lists

the part numbers of the pump rebuild kit. Instructions and diagrams are included in the kit.

A flow and leak check after rebuilding the sample pump is recommended. A span check and

re-calibration after this procedure is necessary as the response of the analyzer changes with

the RCEL pressure.

9.3.5. Changing the Pump and IZS Dust Filters

The exhaust air from the analyzer passes a small particle filter (DFU filter, part # FL3)

before entering the pump. When this particle filter becomes visibly dirty or the pressure

drop between SAMP and RCEL pressure increases significantly, it needs replacement in

order to prevent a large pressure drop with degraded analyzer performance.

• Power down the analyzer and pump.
• For internally mounted filters, skip the next two steps.
• For externally mounted filters on the pump housing, remove the analyzer exhaust

tube from the dust filter. Remove the particle filter from the pump. To do so, push

the white plastic ring into the fitting and pull the filter out of the fitting. If necessary,
use needle-nose pliers to pry the filter out of the fittings.

• Push a new filter into the pump fitting and make sure that the arrow on the filter

points towards the pump. Push the exhaust tubing onto the filter. Skip the next two

steps.

• For internally mounted filters at the inside rear panel, remove the chassis and locate

the filter between the vacuum manifold and the exhaust port fitting.

• Disconnect the clear tubing from the filter body and change the filter with the arrow

pointing against the gas flow. To remove the hose clamps, slide the two clamp ends

in opposite directions with a needle-nose pliers until the clamp comes apart.
Reconnect the tubing by using the same or new clamps and pushing tightening them

until a good seal is achieved.

• Restart the pump and clear any error warnings from the front panel display.
• After about 5 minutes, check the RCEL pressure reading and ensure that it is similar

to its value before changing the filter but less than 10 in-Hg-A.

A similar procedure applies to the same DFU particle filter that is used in the optional IZS

zero air scrubber assembly (Figure 9-4). To change this filter, simply disconnect the tube
and fitting from one end and remove the filter from the scrubber cartridge. Insert a new

filter and attach the tubing. Make sure that the embedded small arrow points in flow
direction.

9.3.6. Changing the IZS Permeation Tube

The optional IZS permeation tube that is filled with liquid NO

2

will be exhausted at some

point. The lifetime depends on the frequency of usage. To change this tube, purchase a

replacement and then

• Turn off the analyzer, unplug the power cord and remove the cover.
• Locate the IZS oven in the rear left of the analyzer.
• Remove the top layer of insulation if necessary.