Enterasys Networks CSX6000 User Manual
Page 518
USER’S GUIDE
518 CyberSWITCH
Manual restart initiated on DM board in slot
modem restart
command.
Check subsequent log messages to verify the command was successful.
Max ATI3 retries exceeded on modem
up. Call Customer Support.
Maximum call charges exceeded for month
The configured maximum for monthly call charges has been exceeded.
Maximum call minutes per day limit (x) has been reached
The described limit has been exceeded. The next log message will indicate whether calls will still
be allowed or not.
Maximum call minutes per month limit (x) has been reached
The described limit has been exceeded. The next log message will indicate whether calls will still
be allowed or not.
Maximum calls per day limit (x) has been reached
The described limit has been exceeded. The next log message will indicate whether calls will still
be allowed or not.
Maximum calls per month limit (x) has been reached
The described limit has been exceeded. The next log message will indicate whether calls will still
be allowed or not.
MCP detected channel failure:
message is generally preceded by another message which indicates the underlying protocol. Refer
to that message. If this does not pinpoint the problem, check the application on the remote device
to see if it is working correctly.
Memory Access Timeout
This indicates a TDM bus connector failure that is specific to the TDM bus connecting a primary
rate and a basic rate adapter. Ensure that the TDM bus has been correctly connected to the two
adapters. If problem continues, contact your Distributor or Customer Support.
MEMORY LIMITED -
memory available to support the number of compression connections being allocated. You may
want to purchase more memory for your system. Contact your Distributor or Customer Support.
Mild congestion CLLM received for DLCI
with the indicated DLCI.
Mismatch of configured and installed DM card in slot
match how the card is configured in software. Check the hardware and software configuration and
restart.