beautypg.com

Frame relay connections, Ppp link failure detection, Frame relay connections 430 – Enterasys Networks CSX6000 User Manual

Page 430: Ppp link failure detection 430

background image

USER’S GUIDE

430 CyberSWITCH

F

RAME

R

ELAY

C

ONNECTIONS

To verify a frame relay connection to the CyberSWITCH, the WAN lines that are connected to the
System must be available for use, and the routing option must be properly initialized. To verify a
frame relay connection, perform the following:

1.

Enter the

frame relay stats

command at the administration console.

a.

If the statistics display appears, the frame relay feature is configured and the frame relay
subsystem should be operational.

b.

If you receive the message:

No Frame Relay Accesses configured,

verify your

configuration. Refer to

Frame Relay Accesses

in the Configuring Alternate Accesses chapter.

2.

Enter the

cs

command at the administration console. The device name for the associated PVC

should appear in the list of connected sites.

3.

Check the report log (

dr

) for additional messages. If you see any of the following, you may

have a problem:

Unexpected error during transmission of LMI frame

[FR_IETF] Authentication Failure of remote device “NAME”

[FR_IETF] Off-node Authentication Failure of remote device “NAME”

Try the following:

a.

If the system displays the

Unexpected error during transmission of LMI

frame

message: Use CFGEDIT to change the Frame Relay LMI type. Refer to

Configuring

General Access Information

in the Configuring Alternate Accesses chapter.

b.

If the system displays one of the following messages:

[FR_IETF] Authentication Failure of remote device “NAME”

[FR_IETF] Off-node Authentication Failure of remote device “NAME”

It indicates that the device database does not have a device entry corresponding to the per-

manent virtual circuit. Use CFGEDIT to change the PVC name to match the remote device
name. Refer to

Configuring a PVC

in the Configuring Alternate Accesses chapter.

PPP L

INK

F

AILURE

D

ETECTION

To verify that Frame Relay’s Link Failure Detection is enabled, perform a trace to view the Echo-
Request and Reply packets:

1.

With the feature enabled, establish a connection.

2.

Erase the system log (

er

command).

3.

Issue the

trace ppp on

console command.

4.

Wait for at least the configured Echo Frequency.

This manual is related to the following products: