beautypg.com

Psb-2000 series user manual – GW Instek PSB-2000 Series User Manual User Manual

Page 92

background image

PSB-2000 Series User Manual

92

Frame Link Controlled Series Operation

(excluding PSB-2400L2, PSB-H series)

Description

The PSB-L series power supply (exlcluding the
PSB-2400L2) units are capable of frame link
controlled series operation of up to two units,
including the master unit. When performing series
operation using master units, the slave unit should
be set properly in advance, see the Master-slave
function
chapter on page 70.

Output depends on the master unit. When the
OUTPUT key on the master unit is pressed, the
output of the slave unit is turned on automatically.
Connect the master and slave unit with the optional
PSB-006 cable.

CAUTION Improper wiring or setting may cause failures.

Recheck the setting before starting frame link
control operation.

Load

+grounding

±grounding

-grounding

+O

U

T

-O

U

T

Master unit

F

.G

(F

ra

m

e

g

ro

u

n

d

+S

+O

U

T

-O

U

T

-S

J1

J2

+O

U

T

-O

U

T

Slave unit

F

.G

(F

ra

m

e

g

ro

u

n

d

+S

+O

U

T

-O

U

T

-S

J1

J2

PSB-006