C5/K1/K3 Integrated Satellite Terminal System

Installation

Rev. 0

3–9

1

2

3

4

5

6

7

8

9

10

TIGHTEN BOLTS PER ILLUSTRATED SEQUENCE

Figure 3-2. LNA Installation

3. Connect cables as follows:

a.

Connect receive cable from the ODU to the IDU CP2 connector.

c. Connect transmit cable from the ODU to the IDU CP1 connector.

d. Connect the receive cable to the C-Band LNA (mounted on the OMT).

e.

Connect the transmit cable to the OMT.

4. Perform operational testing of the C-Band System as outlined in Chapter 6,

System Checkout.