beautypg.com

Satellite terminal system installation, Idu installation – Comtech EF Data C5 User Manual

Page 102

background image

Installation

C5/K1/K3 Integrated Satellite Terminal System

3–6

Rev. 0

3.3

Satellite Terminal System Installation

3.3.1 IDU

Installation

Refer to Figure 3-1.

1. Install the IDU as follows:

a. If required, install the mounting bracket in equipment rack. Install and

tighten the bracket bolts.

b. Loosen the screw with flat washer located on the left side of modem chassis.

Mount the modem chassis into the equipment rack and slide the screw with
flat washer through the slot of the mounting bracket. Tighten the screw
sufficiently to allow the modem chassis to slide in the bracket.

c. Connect the cables to the proper locations on the rear panel. Refer to

Section 3.4 for connector pinouts, placement, and function.

d. Connect the primary power cable to the power source. Before turning on the

power switch, become familiar with the front panel operation in Chapter 4.

e. Perform operational testing of the Satellite Terminal System as outline in

Chapter 6, System Checkout.

2. Connect cables as necessary.

CAUTION

Ensure the transmit and receive cables are properly installed.
Improper installation of the cables will cause the LNA to be
damaged.

This manual is related to the following products: