Exhaust system installation – Lull 944E-42 Service Manual User Manual
Page 233

7.31
Model 644E-42/944E-42
Rev. 6/04
Engine: Cummins 4BT 3.9, B4.5T and QSB 4.5T
3. Loosen the lower clamp (7) attaching the flex
pipe (8) to the muffler (9). Loosen and remove the 
two screws (10) securing the bracket (11) to the 
muffler (9). Remove the four screws (12 and 13), six 
washers (14 and 15) and two nuts (16) securing the 
muffler (9) to the frame. Remove the muffler.
4. Loosen the upper clamp (17) on the flex pipe, and
remove the flex pipe (8). Loosen the V-band 
clamp (18) securing the exhaust pipe (19) to the 
turbo outlet (20). Remove the exhaust pipe.
7.9.2
Exhaust System Installation
1. Install the turbo outlet exhaust pipe (19) onto the
engine turbocharger outlet (20). Install, but do not 
tighten, the V-band clamp (18) around the turbo 
outlet exhaust pipe. Align the elbow (23) (bend) 
portion of the exhaust pipe, so that the pipe is 
parallel (24) with the frame of the vehicle. Secure the 
exhaust pipe (17) to the Turbo outlet (18) by 
tightening the V-band clamp (16). Torque the V-band 
clamp to 4-5 lb-ft (6-7 Nm).
2. Install the muffler bracket (11) to the frame. Apply
Loctite® 242 (blue) to the screws and loosely secure 
bracket in place with two screws (12), four washers 
(14) and two nuts (16).
3. Slide the front muffler bracket (21) onto the hanger
on the frame (22). Apply Loctite® 242 (blue) to the 
screws and loosely secure front of muffler in place 
with two screws (13) and washers (15).
4. Lift the rear of the muffler into place. Apply Loctite®
242 (blue) to the screws and secure rear of the 
muffler to the bracket with two screws (10). Torque 
screws to 19-38 lb-ft (26-52 Nm).
5. Slide the flex pipe (8) between the muffler (9) and
the exhaust pipe (19). Align the flex pipe (8) with the 
muffler (9) and the exhaust pipe (19). Correct 
alignment between the flex pipe (8) and exhaust 
pipe (19) will have been achieved when the center 
lines (25) and (26) of each is aligned. This must be 
done when viewing the exhaust system from the 
rear (25) and side (26) of the vehicle. Secure the 
muffler (9) and muffler bracket (11) to the frame. 
Torque screws to 19-38 lb-ft (26-52 Nm).
6. Secure the flex pipe (8) to the muffler (9) and the
exhaust pipe (19). Torque the clamp bolts to 
45-60 lb-ft (61-81 Nm).
7. If the vehicle has dual batteries, connect both
negative battery cables (1 and 2) to both batteries.
Connect the lower negative battery cable (1) to the 
negative (-) terminal on the lower battery (3). Swing 
the upper battery box (6) in and make sure that the 
lip (5) on the upper battery box slides below the 
knob (4). Secure in place with the knob (4).
MU2072
7
8
17
12
13
14
9
15
16
18
19
20
Front
10
11
21
22
MU5411
23
24
25
26
Rear View
Side View
