beautypg.com

4 removal, 1 powering down the system, 2 removing the system – Artesyn Centellis 4100 Installation and Use (2015) User Manual

Page 92

background image

System Installation

Centellis 4100 Installation and Use (6806800D82E)

94

15.Query the shelf manager to ensure the PEM is operating properly.

3.4

Removal

The following subsections describe the procedures for:

Powering down the system

Removing the system

3.4.1

Powering Down the System

For data integrity reasons Artesyn Embedded Technologies - Embedded Computing
recommends to save data and close all applications before powering down the system.

Power-Down Procedure

To power down the system, proceed as follows:

1. Power down all inserted and active blades using a system management software.

2. Insert a screw driver or a small object into the small slot at the top of the breaker. It

automatically switches PEMs to 0/OFF.

3.4.2

Removing the System

To reduce the effective weight and make it easier to remove the system, remove all heavy FRUs
from the system. This includes the following:

Blower trays

Power entry modules