2 site and installation planning – Artesyn Centellis 4100 Installation and Use (2015) User Manual

Page 64

background image

Site Preparation

Centellis 4100 Installation and Use (6806800D82E)

66

3. Check the rails for proper alignment.

4. Check that the air filter is properly installed.

5. Check that the cable connections are secure and properly fitted.

6. Check the EMI gaskets for damage.

7. Check the items listed above for damage and report any damage or differences to

the customer service at Artesyn website.

8. Tighten loose screws before proceeding.

9. Remove the desiccant bags delivered together with the system and dispose of

them according to your country’s legislation.

2.2.2

Site and Installation Planning

Planning basic site and installation requirements you have to consider the following issues:

1. Is adequate power for the Centellis 4100 system available?

2. Can the system be positioned in a way that -48 to -60V DC power source is easy to reach?

3. Are racks with sufficient space to install the system available?

4. Is suitable equipment available to lift the system into the rack?

5. Is there enough space to run a system console terminal? Is the cable long enough to reach

the system?

6. Are the inlet and outlet of the blowers and therefore the airflow not blocked?

The system is thoroughly inspected before shipment. If any damage occurred during
transportation or any items are missing, please contact our customer's service immediately.