Site preparation, 1 overview, 2 site planning considerations – Artesyn Centellis 4100 Installation and Use (2015) User Manual
Page 63: 1 receiving and unpacking the system, 1 overview 2.2 site planning considerations, Site planning considerations, Chapter 2

Chapter 2
Centellis 4100 Installation and Use (6806800D82E)
65
Site Preparation
2.1
Overview
The following sections help you to prepare system installation:
2.2
Site Planning Considerations
This section provides information to prepare the site and the shelf for installation.
2.2.1
Receiving and Unpacking the System
Carefully inspect the system and all components delivered together with it.
Shipment Inspection
To inspect the shipment perform the following steps:
1. Verify that you have received all items of your shipment.
Compare the shipment thoroughly with the delivery note.
2. Visually inspect the shelf to ensure that all of the connector pins are straight,
shrouds are properly seated, screws are tight, etc..
Section
Gives Information On
Site Planning Considerations
This section includes information on unpacking and
inspecting the system, requirements, technical data, and
other information you need to know before you start system
installation.
Site Planning Checklists
This section provides checklists for site preparation.
Damage of Circuits
Electrostatic discharge and incorrect RTM installation and removal can damage circuits or
shorten their life.
Before touching the RTM or electronic components, make sure that you are working in an
ESD-safe environment.
- AXP640 Installation and Use (April 2015) AXP1620 Installation and Use (August 2014) AXP1620 Installation and Use (September 2014) Centellis-4440/AXP-1440 Installation and Use (August 2014) Centellis-4440/AXP-1440 Installation and Use (July 2014) AXP1620 Installation and Use (May 2014) Centellis-4440/AXP1440 Installation and Use (August 2014) Centellis-4440/AXP-1440 Installation and Use (May 2014) Centellis-4440/AXP1440 Installation and Use (September 2014) AXP640 Installation and Use (May 2014)