Artesyn Centellis 4100 Installation and Use (2015) User Manual
Page 133

FRU Installation
Centellis 4100 Installation and Use (6806800D82E)
135
5. Before removing the PEM connections, ensure the breaker is in the OFF (tripped)
position (the red portion is visible on the top of the breaker). If the breaker is not in
the OFF position, trip the breaker to the OFF position.
6. Remove the rubber boots.
7. Remove the M6 nuts, lockwashers and spring rings from each of the connections
on the PEM and set aside. Remove the feed cables and place out of the way.
8. Unfasten the four M3 captive screws (2 top, 2 bottom).
This manual is related to the following products:
- AXP640 Installation and Use (April 2015) AXP1620 Installation and Use (August 2014) AXP1620 Installation and Use (September 2014) Centellis-4440/AXP-1440 Installation and Use (August 2014) Centellis-4440/AXP-1440 Installation and Use (July 2014) AXP1620 Installation and Use (May 2014) Centellis-4440/AXP1440 Installation and Use (August 2014) Centellis-4440/AXP-1440 Installation and Use (May 2014) Centellis-4440/AXP1440 Installation and Use (September 2014) AXP640 Installation and Use (May 2014)