beautypg.com

Artesyn Centellis 4100 Installation and Use (2015) User Manual

Page 139

background image

FRU Installation

Centellis 4100 Installation and Use (6806800D82E)

141

18.If you decided to inform shelf management about the replacement, set the PEM

handle switch to the Closed position now. The blue H/S LED on the PEM will change
from on steady to blinking (long intervals) to off.

19.Query the shelf manager to ensure the PEM is operating properly.