Running a go-nogo test – GW Instek PEL-3000 Series User Manual User Manual

Page 92

background image

PEL-3000 User Manual

90

5. Set the Delay Time.

The delay time setting will delay activating the
Go-NoGo testing by a specified amount of time.

The delay setting can compensate for startup
oscillation and other instabilities during startup.

Delay Time

0.0~1.0 seconds (0.1s resolution )

Note

When the Main settings are saved or recalled, the
Go-NoGo settings are also saved/recalled. See the
Save/Recall chapter for details, page 119.

Running a Go-NoGo Test

Description

Go-NoGo test results are displayed in the
measurement panel.

GO indicates pass (good).

NG indicates fail (no good).

Operation

1. Press

Main

> Configure[F5] > Go-NoGo[F3].

2. Set SPEC Test to ON.

When SPEC Test is ON, SPEC will appear in the
Operation Status Panel. This means the unit is
ready for Go-NoGo testing.

3. Turn the load on.

The test starts from the time the load was turned
on + the Delay Time.