Scheduling an nqa test group, Configuration prerequisites, Displaying and maintaining nqa – H3C Technologies H3C SecPath F1000-E User Manual
Page 92
26
Scheduling an NQA Test Group
By configuring NQA test group scheduling, you can set the start time and test duration for a test group
to perform NQA tests. The start time can take a specific value or can be now, which indicates that a test
is started immediately; the test duration can take a specific value or can be forever, which indicates
that a test does not stop until you use the undo nqa schedule command to stop the test.
A test group performs tests when the system time is between the start time and the end time (the start time
plus test duration). If the system time is behind the start time when you execute the nqa schedule
command, a test is started when the system time reaches the start time. If the system time is between the
start time and the end time, a test is started at once. If the system time is ahead of the end time, no test
is started. To view the current system time, use the display clock command.
Configuration prerequisites
Before scheduling an NQA test group, make sure:
•
Required test parameters corresponding to a test type have been configured;
•
For a test that needs the cooperation with the NQA server, configuration on the NQA server has
been completed.
Scheduling an NQA test group
Follow these steps to schedule an NQA test group:
To do…
Use the command…
Remarks
Enter system view
system-view
—
Schedule an NQA test group
nqa schedule admin-name
operation-tag start-time
{ hh:mm:ss [ yyyy/mm/dd ] |
now } lifetime { lifetime |
forever }
Required
Configure the maximum number of
tests that the NQA client can
simultaneously perform
nqa agent max-concurrent
number
Optional
CAUTION:
•
After an NQA test group is scheduled, you cannot enter the test group view or test type view.
•
A started test group or a test group that has completed tests will not be influenced by the system time
change; only a test group that is waiting to perform tests will be influenced by the system time change.
Displaying and Maintaining NQA
To do…
Use the command…
Remarks
Display history records of NQA
test operation information
display nqa history [ admin-name
operation-tag ]
Display the current monitoring
results of reaction entries
display nqa reaction counters
[ admin-name operation-tag [ item-number ] ]
Display the results of the last NQA
test
display nqa result [ admin-name
operation-tag ]
Available in any view