4. Click OK and place the Set Bit Object on the window. It will appear as a square frame. Click on the screen to

deselect it, then double-click on it to reopen the properties (or right-click on it and select Attribute). Click the
Profile tab and set the Width and Height to 65 (pixels). Click OK to accept the new Profile settings.

5. Move the Set Bit Object over the Arrow Up button.

6. Copy and paste the Set Bit Object and place the second one over the Arrow Down button. When the Up or

Down buttons are pressed, the pump and pipe will change states to indicate that they are on.

Finishing Up

There are still a few more steps to finish your first project. In this section, you will:

save the project onto your computer hard drive

compile the project into a format that can be understood by the HMI

run the offline simulator to test the project

download the project to the HMI

verify that the HMI operates as expected

exit the EZwarePlus software

Saving your first project

1. From the File menu, click Save As. The Save As dialog box appears.

2. Use the drop-down menus to locate the project folder in EZwarePlus.