beautypg.com

Basic operations for level 3 storage, Level 3 system power-off procedure, Level 3 system power-on procedure – Grass Valley K2 Storage System Instruction Manual v.3.1 User Manual

Page 190

background image

190

K2 Storage System Instruction Manual

September 6, 2006

Chapter 5 Installing the Level 3 Storage System

instructions.

• For K2 Media Clients, refer to K2 Media Client System Guide for instructions.

Basic operations for Level 3 storage

Use the following procedures as you work on your Level 3 storage system:

“Level 3 system power-off procedure”

“Level 3 system power-on procedure”

“Using FTP for file transfer”

For other procedures refer to

“Administering and maintaining the K2 Storage

System” on page 333

.

Level 3 system power-off procedure

Use the following sequence to power-off the Level 3 storage system.

1. Power-off all K2 Media clients or other iSCSI clients.

2. Shut down the K2 Media Server that is the media file system and database server.

3. Shut down the K2 Media Server that is the FTP server.

4. Power-off the primary RAID controller chassis. If expansion chassis are

connected, make sure the power-off of the controller chassis is prior to or
simultaneous with the power-off of its connected expansion chassis. Wait
approximately 30 seconds for the disk drives to spin down before proceeding.

5. Power-off all Ethernet switches.

6. Power-off the control point PC and/or the NetCentral server PC, if necessary.

Level 3 system power-on procedure

Use the following steps to power-on the Level 3 storage system

.

Device

Verification instructions

1.

Power-on the control point
PC and/or the NetCentral
server PC.

After log on, start NetCentral. NetCentral reports devices as
offline. As each device is powered on, check NetCentral to verify
the device’s status.

This manual is related to the following products: