beautypg.com

Level 2r system power-on procedure – Grass Valley K2 Storage System Instruction Manual v.3.1 User Manual

Page 141

background image

September 6, 2006

K2 Storage System Instruction Manual

141

Level 2R system power-on procedure

approximately 30 seconds for the disk drives to spin down before proceeding.

9. Power-off all Ethernet switches.

10.Power-off the control point PC and/or the NetCentral server PC, if necessary.

Level 2R system power-on procedure

Use the following steps to power-on the Level 2R storage system

.

Device

Verification instructions

1.

Power-on the control point
PC and/or the NetCentral
server PC.

After log on, start NetCentral. NetCentral reports devices as
offline. As each device is powered on, check NetCentral to verify
the device’s status.

2.

Power-on the Ethernet
switches.

This description is for the HP
ProCurve switch.

The switch performs its diagnostic self test, which takes
approximately 50 seconds to complete. LED Behavior during the
self test is as follows:

Initially, all the status, LED Mode and port LEDs are on
for most of the duration of the test.

Most of the LEDs go off and then may come on again
during phases of the self test. For the duration of the self
test, the Test LED stays on.

When the self test completes successfully, the Power and Fan
Status LEDs remain on, the Fault and Test LEDs go off, and the
port LEDs on the front of the switch go into their normal
operational mode, which is as follows:

If the ports are connected to active network devices, the
LEDs behave according to the LED Mode selected. In the
default view mode (Link), the LEDs should be on.

If the ports are not connected to active network devices,
the LEDs will stay off.

If the LED display is different than what is described above,
especially if the Fault and Test LEDs stay on for more than 60
seconds or they start blinking, the self test has not completed
correctly. Refer to the manual you received with the switch for
troubleshooting information.

3.

Power-on RAID storage
devices.

Power-on expansion chassis (if present) prior to or simultaneous
with the power-on for the main Fibre Channel chassis.

NOTE: Always power-on the RAID Expansion
chassis prior to, or simultaneously with the
RAID Controller chassis.

Verify that start-up indicators show normal start-up processes, as
follows:

Wait until all disk access LEDs are steady —
approximately 4 minutes.

The controller READY LED is ON

The controller DIR LED flashes green

The front Power LED is ON

The front Service LED is OFF

Refer to the

L2 RAID

Instruction Manual to interpret other

disk access LED or status LED behavior.

This manual is related to the following products: