Channel control connection, Pel-2000 series user manual, Turn on/off loads – GW Instek PEL-2000 Series User Manual User Manual
Page 56: Supply a reference voltage
PEL-2000 Series User Manual
56
Channel Control Connection
Background
The Channel Control connecters are located on the
rear panel of each mainframe. There are two
channel control connectors for each load slot, one
for each channel, if applicable. The channel control
connector is used to externally:
Turn on/off loads.
Supply a reference voltage.
Monitor the load input.
For further details on channel control and the
interface see pages 85, 235.
AWG 24
STRIP GAUGE
10.0 mm
1
CH CONT 1
1
CH CONT 2
1
CH CONT 3
1
CH CONT 4
1
CH CONT 5
1
CH CONT 6
1
CH CONT 7
1
CH CONT 8
SER. NO. LB
2
1
FRAME CONT
GO / NG OUTPUT
GPIB
RS232C
DISCONNECT POWER CORD
BEFORE REPLACING FUSE
50/60 Hz
180 VA MAX
AC
250V
T 3.15A
REPLACE FUSE
115V
230V
FUSE RATING
AS SPECIFIED
WARNING
TO AVOID ELECTRIC SHOCK THE POWER CORD PROTECTIVE
DO NOT REMOVE COVERS. REFER SERVICING TO QUALIFIED PERSONNEL.
250V FUSE OF THE SPECIFIED TYPE AND RATING.
FOR CONTINUED FIRE PROTECTION. REPLACE FUSE ONLY WITH
NO OPERATOR SERVICEABLE COMPONENTS INSIDE.
GROUNDING CONDUCTOR M UST BE CONNECTED TO GROUND.
The Channel Control input/output pin layout is shown
below.