Cygnus 2 Operating Manual

1

Confirm that AC line voltage is supplied and proper for the Cygnus 2.

2

Confirm that the back panel (main) AC switch is in the ON position.

3

Press the ON/STBY button on the front panel. A green pilot light should be
illuminated next to the power switch.

4

The fan at the back of the Cygnus 2 should be exhausting air.

5

After the initial temporary boot-up screen which can be viewed in Maintenance
Sys Status, the LCD monitor will display an image similar to the one shown in

Figure 1-1

or

Figure 1-2

.

Figure 1-1 Operate screen show graph

Figure 1-2 Operate screen show all materials