beautypg.com

Check battery installation status, Dc operation, E149 – GW Instek GSP-830 User Manual User Manual

Page 149

background image

BATTERY / DC OPERATION

149

2. Press F3 (Battery). The level

icon appears at the bottom of
the display.

Battery

F 3

Fully charged

50% to 25%

75% to 50%

Less than 25%

Note

Regardless of battery check, the GSP-830
shows the icon for 5 seconds every 30 minutes.

Battery
maintenance

To prolong the battery life, take out the batteries when
they are not in use for more than one month.

Parameter Usage

time

3 hours (typical)

Charge

time

3 hours (typical)

Check battery installation status

Panel operation

1. Press the System key.

System

2. Press F6 (More).

More...

F 6

3. Press F4 (System Config On).

The configuration appears.

System Config

On Off

F 4

4. The Battery sign shows the

installation status, installed
(checked) or not installed
(unchecked).

Installed

Not installed

DC Operation

Panel operation

Connect the DC power cable to the
rear panel input connector.

Specification

12V, 40W max, 2.1mm plug

Battery charging

When the DC power is in use, the batteries are also
charged.

Note

DC power cable (with a lighter plug for automobile
usage) is available as an optional item, GTL-401
(page174).