Arc Machines 307 User Manual
Page 95

Arc Machines, Inc. Model 307 Orbital Tube Welder Training
Document No. 740096 Chapter 8. Page 7.
Rev. A
Weld Schedule- Weld Levels scrolled down to view Level Time
To Add or Delete a Level.
The default for automatically generated schedules is 4 Levels. If you wish to
add a level, select the level you wish to copy and touch the Level bar to dis-
play the pull-down menu. Select Copy this level to create another level
indentical in all parameters to the level selected. Select Delete Level to
delete the level. You will be prompted with “Do you want to delete level?”
Touch “Yes” to delete the level.
Add Level button. Selecting the Add Level button creates
a new level identical to the last level to the right of the last
level. You must scroll horizontally with the scroll bar to view
the added level.
Note that if changes are made to Level Position the Level Time is automat-
ically adjusted, and vice-versa. However, if a new level is added, you must
enter either time or a new position in the new level in order for the electrode
to advance past the previous last level.
Copy this level
Delete Level
Scroll bar
moved
down to
view or
adjust Level
Times