beautypg.com

Arc Machines 307 User Manual

Page 131

background image

Arc Machines, Inc. Model 307 Orbital Tube Welder Training

Document No. 740096

Chapter 12. Page 2.

Rev.A

To make a Test Run of a weld schedule, open the

schedule and from the Weld Schedule - Main screen,

touch the grey Single Entry button. Set downslope to

0.0 and touch OK.

From the Weld Schedule - Main Screen, touch the grey Weld

button to show the Weld Schedule - Weld screen with the

green Test button. To make the Test Run, touch the red

Start button. Verify that the electrode travels 360° plus the

desired overlap or tie-in. Adjust time and or level position as

necessary.

At the end of the

TEST

RUN

, re-enter the

DOWNSLOPE

TIME

.