beautypg.com

Install the power distribution board, Next steps – FUJITSU SPARC T5440 User Manual

Page 154

background image

128

SPARC Enterprise T5440 Server Service Manual • July 2009

▼ Install the Power Distribution Board

1. Align the keyholes in the power distribution board with the corresponding

mushroom standoffs in the chassis.

2. Lower the power distribution board into the chassis.

FIGURE:

Installing the Power Distribution Board

3. Install the No. 2 Phillips screw.

4. Install the two 7 mm nuts securing the bus bars to the power distribution board.

5. Plug in the flex cable connector.

Ensure that the auxilliary power cable is routed under the flex cable connector.

6. Plug in the auxiliary power cable.

7. Install the flex cable retainer.

Place the retainer into position and tighten the captive No.2 Phillips screw.

Next Steps

“Install the Top Cover” on page 150

“Slide the Server Into the Rack” on page 151

“Install a Power Supply” on page 90

Note –

Install all four power supplies.

“Connect the Power Cords to the Server” on page 153

“Power On the Server” on page 153