beautypg.com

FUJITSU SPARC T5440 User Manual

Page 114

background image

88

SPARC Enterprise T5440 Server Service Manual • July 2009

FIGURE:

Installing a Power Supply

3. Reconnect the power cord to the power supply.

Verify that the power supply LED is green or blinking green.

4. Verify that the system Power Supply Fault LED, and the front and rear Service

Required LEDs are not lit.

Note –

See

“Front Panel LEDs” on page 4

and

“Rear Panel LEDs” on page 7

for more

information about identifying and interpreting system LEDs.

5. At the ILOM -> prompt, use the show faulty command to verify the status of

the power supplies.