Yaskawa Sigma II Series SGMVH User Manual
Page 66

4 SERVOPACK Specifications and Dimensional Drawings
4-6
Installation
Follow the procedure below to install multiple SERVOPACKs side by side in a control panel.
SERVOPACK Orientation
Install the SERVOPACK perpendicular to the wall so the front panel containing connectors faces outward.
Cooling
As shown in the figure above, allow sufficient space around each SERVOPACK for cooling by cooling fans
or natural convection.
Side-by-side Installation
When installing SERVOPACKs side by side as shown in the figure above, allow at least 100 mm between
and at least 120 mm above and below each SERVOPACK. Allow the space for eyebolts on both sides of the
SERVOPACK.
Environmental Conditions in the Control Panel
Surrounding Air Temperature:0 to 55
°C
Humidity: 90
% RH or less
Vibration: 4.9 m/s
2
Condensation and Freezing: None
Surrounding Air Temperature for Long-term Reliability: 45
°C or less
Voltage
Resistance Test
Conduct voltage resistance tests under the following conditions.
• Voltage: 1500 Vrms AC for one minute
• Braking current: 100 mA
• Frequency: 50 or 60 Hz
• Voltage applied points
200 V series: Between the ground terminals and the point where terminals L1C/r, L3C/t, L1/R, L2/S, L3/T
are connected.
400 V series: Between the ground terminals and the point where terminals 480 V, 460 V, 440 V, 400 V, 380 V,
0 V, L1/R, L2/S, L3/T are connected.
Fan
50 mm min.
100 mm min.
120 mm
min.
120 mm
min.
Fan
.4
.5
.6
7
8
9
8
8
&7
8
8
8
&9
&8
$
8
&%
0
$
&%
2
%*#4)'
5
*
&
)
㧖㧖㧖㧖
6
#
5'
'
/1&
-
5'4812#%
#
;#5-#9
4
1
2
'
4
#
6
1
%0
%0
219'4
%0
WARNING
ෂޓ㒾
ㅢ㔚ਛ߮㔚Ḯࠝࡈᓟ5
ಽ㑆ޔ┵ሶㇱߦ⸅ࠆߥ
electric shock.
Disconnect all power
May cause
ᗵ㔚ߩᕟࠇࠅ
before servicing.
and wait 5 min.
grounding techniques.
ធ⛯ߖࠃ
Use proper
ᔅߕࠕ㧙ࠬ✢ࠍ
.4
.5
.6
7
8
9
8
8
&7
8
8
8
&9
&8
$
8
&%
0
$
&%
2
%*#4)'
5
*
&
)
㧖㧖㧖㧖
6
#
5'
'
/1&
-
5'4812#%
#
;#5-#9
4
1
2
'
4
#
6
1
%0
%0
219'4
%0
WARNING
ෂޓ㒾
ㅢ㔚ਛ߮㔚Ḯࠝࡈᓟ5
ಽ㑆ޔ┵ሶㇱߦ⸅ࠆߥ
electric shock.
Disconnect all power
May cause
ᗵ㔚ߩᕟࠇࠅ
before servicing.
and wait 5 min.
grounding techniques.
ធ⛯ߖࠃ
Use proper
ᔅߕࠕ㧙ࠬ✢ࠍ
.4
.5
.6
7
8
9
8
8
&7
8
8
8
&9
&8
$
8
&%
0
$
&%
2
%*#4)'
5
*
&
)
㧖㧖㧖㧖
6
#
5'
'
/1&
-
5'4812#%
#
;#5-#9
4
1
2
'
4
#
6
1
%0
%0
219'4
%0
WARNING
ෂޓ㒾
ㅢ㔚ਛ߮㔚Ḯࠝࡈᓟ5
ಽ㑆ޔ┵ሶㇱߦ⸅ࠆߥ
electric shock.
Disconnect all power
May cause
ᗵ㔚ߩᕟࠇࠅ
before servicing.
and wait 5 min.
grounding techniques.
ធ⛯ߖࠃ
Use proper
ᔅߕࠕ㧙ࠬ✢ࠍ
.4
.5
.6
7
8
9
8
8
&7
8
8
8
&9
&8
$
8
&%
0
$
&%
2
%*#4)'
5
*
&
)
㧖㧖㧖㧖
6
#
5'
'
/1&
-
5'4812#%
#
;#5-#9
4
1
2
'
4
#
6
1
%0
%0
219'4
%0
WARNING
ෂޓ㒾
ㅢ㔚ਛ߮㔚Ḯࠝࡈᓟ5
ಽ㑆ޔ┵ሶㇱߦ⸅ࠆߥ
electric shock.
Disconnect all power
May cause
ᗵ㔚ߩᕟࠇࠅ
before servicing.
and wait 5 min.
grounding techniques.
ធ⛯ߖࠃ
Use proper
ᔅߕࠕ㧙ࠬ✢ࠍ