6.1 Wiring Main Circuit

6

Wiring

6-7

(4) Three-phase 400 V, 37 kW to 90 kW SERVOPACKs

„

Designing a Power ON Sequence

Note the following points when designing the power ON sequence.

• Design the power ON sequence so that main circuit power supply is turned OFF when a servo alarm signal

is output. See the previous circuit figure.

• Hold the power ON button for at least two seconds. The SERVOPACK will output (1Ry is OFF) a servo

alarm signal for two seconds or less when power is turned ON. This is required in order to initialize the
SERVOPACK.

• Select the power supply specifications for the parts in accordance with the input power supply.

L1/R

DC24P

PG

U

V

W

M

+24V

0 V

24

1Ry

31

32

1D

OFF

1Ry

ON

1Ry

L2/S

L3/T

DC24N

B1

B2

DU

DV

DW

U(A)

V(B)

W(C)

1

1b

U

V

W

FG

FG

CN1

CN2

DB24

DBON

R

S

T

1PL

ALM -

ALM+

+10

-15

%

24 VDC

0V

380 to 480 V

SERVOPACK

SGDH-

DEB

(Alarm lamp)

DB Unit

Fan

Main circuit
power

Thermal
protector

Three-phase
380 to 480 VAC

FIL

: Lamp for display
: Surge absorber
: Flywheel diode

1PL
1SA
1D

1QF
FIL
1KM
1Ry

: Circuit breaker (for inverters)
: Noise filter
: Contactor
: Relay

Prepared by customer

Control power
supply

+

1SA

1KM

1KM

1KM

1QF

IMPORTANT

Power supply

Servo alarm (ALM)
output signal

2.0 s max.