beautypg.com

Fuel point - gate activation test – Gasboy Site Controller III Start-Up User Manual

Page 93

background image

MDE-4375 CFN Series Site Controller III Start-Up Manual · June 2005

Page 81

Pump/Dispenser Automatic Test

Fuel Point - Gate Activation Test

This test should not be run until at least one successful fueling transaction is performed, as in
the tests above.

1

Position the vehicle over the ground loop antenna.
Within a few seconds, the gate opener should operate.

2

Follow the gate opener manufacturer’s operating instructions.

3

Verify that the system records the correct VM data.