beautypg.com

Fuel point reader (fpr), 5 vdc measurement – Gasboy Site Controller III Start-Up User Manual

Page 78

background image

DC Power Measurement and Adjustment

Page 66

MDE-4375 CFN Series Site Controller III Start-Up Manual · June 2005

Fuel Point Reader (FPR)

+5 VDC Measurement

1

Unlock, unscrew, and remove the FPR door.

2

Using a DC voltmeter, measure the +5 VDC between the GND test point and the right side of
R26, both located on the FPR CPU PCB (

Figure 9-5

).

3

The acceptable voltage range is +5.0 to +5.1 VDC, but try to adjust it as close as possible to
+5.0 VDC.
Note: There is an access hole in the power supply bracket to facilitate adjustment without

disassembly.

Figure 9-5: Fuel Point Reader+5 VDC Measurement Point