beautypg.com

Dc power, System approvals, Customer knowledge – Gasboy Site Controller III Start-Up User Manual

Page 128: Attach printouts, Parts used

background image

Gasboy Motor Fuel Management System

Page Form-4

MDE-4375 CFN Series Site Controller III Start-Up Manual · June 2005

9. DC POWER

10. SYSTEM APPROVALS

11. CUSTOMER KNOWLEDGE

12. ATTACH PRINTOUTS

13. PARTS USED

Site Controller/Islander: +5 VDC +12 VDC -12 VDC
PCU(s): +5 VDC +12 VDC
ICR(s): +5 VDC +12 VDC
Current Loop Interface: +5 VDC +12 VDC -12 VDC
Consoles: +5 VDC +12 VDC -12 VDC +9 VDC
FPR(s): +5 VDC

Customer Comments:

I am satisfied with the installation of the Gasboy Site Manager: Date:
CFN System and have been trained in its use and Start-up Tech: Date:
operation.

Time Spent on Training: Names of People Trained:
Were test cards locked out? Y/N Who were test cards left with?
Was backup copy made of system and any configuration changes? Y/N

Remarks:

(Use additional sheets if necessary)





Generate and attach printout showing a few transactions with quantity, pump fuel assignments,
limitation codes, authorization codes, and pulse rates. Use the commands PR DA, PR TR, PR PU,
PR AU, PR LIM, PR DI, PR PRI, PR PRO,
and STATUS.

Return defective parts with completed Gasboy Service Report. Please return white, yellow,
and pink copies of report in box with parts