Start-up overview, What you need for testing, Start-up overview what you need for testing – Gasboy Site Controller III Start-Up User Manual
Page 14
Starting a Site Controller III System
Page 2
MDE-4375 CFN Series Site Controller III Start-Up Manual · June 2005
See your GASBOY representative for information.
• CheckPoint Reference Manual, C09204
Describes the operation of the CheckPoint Console.
• Profit Point Reference Manual, MDE-4356
Describes the operation of the Profit Point.
• Profit Point Clerk's Manual, MDE-4355
Describes all point-of-sale operations for the Profit Point.
• Point of Sale and Shift Change Manual, C09215
Describes POS and shift change operations.
• Star
®
Receipt Printer Manual , C08951
Describes the operation of the Star Receipt Printer.
• Series 9800A Installation/Operation Manual, 035235
Describes installation/operation for Series 9800 pumps/dispensers.
• Fuel Point Reader Installation and Retrofit Instructions Manual, C35628
• Fuel Point Dispenser and Hose Retrofit Manual, C35593
• Fuel Point Vehicle Module Installation Manual, C35699
• Fuel Point Vehicle Module Programming Manual, C35629
• Fuel Point Parts Manual, C35709
Start-Up Overview
Start-up for the CFN Site Controller III system consists of:
• gathering site information from customer for loading into system
• verifying the physical system layout
• making sure the system complies with the guidelines and restrictions outlined in the
system Installation Manual and this manual.
• testing the system
• helping the system user execute the commands needed to start the system
• helping the system user back up release disks and explaining backup procedures
• making sure the system user understands how to use the system
• filling out the GASBOY CFN System Start-up Form (55F-066)
What You Need for Testing
To perform the testing portion of start-up, you will need:
• a digital voltmeter
• a 1/4 inch flat blade screwdriver
• a Phillips
®
head #1 screwdriver
• a Phillips head #2 screwdriver
• a plastic 1/8 inch or smaller flat blade screwdriver
• socket handle 1/4" drive
Note:A socket bit #2, P/N C04479, for the island card reader is shipped with every CFN
Site Controller III System. This socket should be left with the end user.
• a tape measure
• diskettes (2-4 blank double-sided, high-density for the SC III; 2 blank high density for the
Profit Point)
We recommend that you bring all your tools and spare parts with you when doing a
Start-up.