Starting a Site Controller III System

Page 2

MDE-4375 CFN Series Site Controller III Start-Up Manual · June 2005

See your GASBOY representative for information.

• CheckPoint Reference Manual, C09204

Describes the operation of the CheckPoint Console.

• Profit Point Reference Manual, MDE-4356

Describes the operation of the Profit Point.

• Profit Point Clerk's Manual, MDE-4355

Describes all point-of-sale operations for the Profit Point.

• Point of Sale and Shift Change Manual, C09215

Describes POS and shift change operations.

• Star

®

Receipt Printer Manual , C08951

Describes the operation of the Star Receipt Printer.

• Series 9800A Installation/Operation Manual, 035235

Describes installation/operation for Series 9800 pumps/dispensers.

• Fuel Point Reader Installation and Retrofit Instructions Manual, C35628
• Fuel Point Dispenser and Hose Retrofit Manual, C35593
• Fuel Point Vehicle Module Installation Manual, C35699
• Fuel Point Vehicle Module Programming Manual, C35629
• Fuel Point Parts Manual, C35709

Start-Up Overview

Start-up for the CFN Site Controller III system consists of:

• gathering site information from customer for loading into system
• verifying the physical system layout
• making sure the system complies with the guidelines and restrictions outlined in the

system Installation Manual and this manual.

• testing the system
• helping the system user execute the commands needed to start the system
• helping the system user back up release disks and explaining backup procedures
• making sure the system user understands how to use the system
• filling out the GASBOY CFN System Start-up Form (55F-066)

What You Need for Testing

To perform the testing portion of start-up, you will need:

• a digital voltmeter
• a 1/4 inch flat blade screwdriver
• a Phillips

®

head #1 screwdriver

• a Phillips head #2 screwdriver
• a plastic 1/8 inch or smaller flat blade screwdriver
• socket handle 1/4" drive

Note:A socket bit #2, P/N C04479, for the island card reader is shipped with every CFN

Site Controller III System. This socket should be left with the end user.

• a tape measure
• diskettes (2-4 blank double-sided, high-density for the SC III; 2 blank high density for the

Profit Point)

We recommend that you bring all your tools and spare parts with you when doing a
Start-up.