Dc power, System approvals, Customer knowledge – Gasboy Site Controller III Start-Up User Manual
Page 122: Attach printouts, Parts used, Sa mple form sa mpl e form sa mple f o rm

Gasboy Motor Fuel Management System
Page S-Form-4
MDE-4375 CFN Series Site Controller III Start-Up Manual · June 2005
Sa
mple
Form
Sa
mpl
e Form
Sa
mple
F
o
rm
9. DC POWER
10. SYSTEM APPROVALS
11. CUSTOMER KNOWLEDGE
12. ATTACH PRINTOUTS
13. PARTS USED
Site Controller/Islander: +5 VDC N/A +12 VDC N/A -12 VDC N/A
PCU(s): +5 VDC 5.00 +12 VDC 11.98
ICR(s): +5 VDC 5.01 +12 VDC 11.99
Current Loop Interface: +5 VDC +12 VDC -12 VDC
Consoles: +5 VDC 5.00 +12 VDC 12.05 -12 VDC 12.00 +9 VDC 9.00
FPR(s): +5 VDC
Customer Comments:
I am satisfied with the installation of the Gasboy Site Manager: Dave Christopher Date: 2-9-05
CFN System and have been trained in its use and Start-up Tech: Arthur Ized Repp Date: 2-9-05
operation.
Time Spent on Training: 4 hours Names of People Trained: Dave Christopher, Christine Tabby
Were test cards locked out? Y/N Who were test cards left with? Dave Christopher
Was backup copy made of system and any configuration changes? Y/N
Remarks:
(Use additional sheets if necessary)
Generate and attach printout showing a few transactions with quantity, pump fuel assignments,
limitation codes, authorization codes, and pulse rates. Use the commands PR DA, PR TR, PR PU,
PR AU, PR LIM, PR DI, PR PRI, PR PRO, and STATUS.
Return defective parts with completed Gasboy Service Report. Please return white, yellow,
and pink copies of report in box with parts