Pump/Dispenser Automatic Test
Page 76
MDE-4375 CFN Series Site Controller III Start-Up Manual · June 2005
Island Card Reader - Pump Activation Test (optional)
1
Place all the override switches, located in the pump control unit(s) (see
)
into the ON position.
2
Using the test cards (provided with each system), select Hose 1.
3
Turn on Hose 1 using the pump handle.
Hose 1 should reset and be able to dispense product.
4
Dispense some product with Hose 1.
5
Turn on all other hose handles.
Only Hose 1 should be activated or dispense product.
6
Turn off all other hose handles.
7
Turn off the handle for Hose 1.
8
Place the handle for Hose 1 back into the ON position.
Hose 1 should not reset and should not dispense product.
9
Verify that the quantity displayed on the Hose 1 register matches the quantity (and price, if
applicable) recorded on the system printout.
10
Repeat steps
through
above for all hose outlets.
below only if you are using dispensers or dual hose
single motor suction pumps.
11
Using the test card, select two hose outlets of the same product type (that use the same
submersible pump).
12
Turn on both pump handles.
Both hose outlets should reset and be able to dispense product.
13
While dispensing product from one hose (A), allow the other hose (B) to time out.
14
When Hose B has timed out, try to dispense product from it by squeezing the nozzle.
You should not be able to dispense product from Hose B. If you can, verify that the dispensers
use solenoid valves rather than hydraulic valves, and re-check that particular pump’s or
dispenser’s wiring.
15
Repeat steps
above for all combinations of hose outlets of the same product
type.