Verification and Backup
1
Verify all data is loaded correctly by using the following commands. If any information
displayed is not correct, return to the appropriate step and reload it.
2
Make backups.
Site Data
Type SYSBACK and press ENTER.
The backup will take a few minutes. The data tables being backed up are shown on the
terminal.
P SIG
Verify that all users are loaded and their permission level; sign-on codes will not be
printed.
P DA
Verify correct date and time.
P H
Verify that receipt heading and footing are correct.
P ME
Verify the broadcast messages are correct.
P PRO
Verify the product/department codes have the correct category, name, minimum and
maximum price, and tax code. Verify the inventory (if loaded) is correct and the PLU price
(if loaded) is correct.
P TA
Verify the tank quantity, product code, and reorder level are correct.
P PU
Verify the pump price code, product code, and tank are assigned to the correct pump.
Verify the quantity and dollar totalizers are correct. Verify that the Limit and Slow are set
correctly.
P PR
Verify all price levels and price are correct.
P SA;I 0
Verify all the tax code names are correct.
P LO
Verify the lockout is set up correctly (all cards valid or invalid).
P A
Verify the authorization codes have the correct product codes assigned.
P LI
Verify the limitation codes have the correct limits.
P CR
Verify the cron entries are correct.
P PH
Verify remote authorization phone numbers are correct.
P PRO; A
Verify the product attributes are correct.
P DR
Verify the current shift and balance for each drawer are correct.
Note: If site is using the Shift Change package, balance and shift number may not verify.
Use VARIABLE command (see below) to verify shift parameters.
P AL
Verify all allocation totalizers are loaded and are correct.
P V
Verify all vehicles are loaded and odometers are correct.
VARIABLE
Verify all parameters for the Shift Change Package are set up correctly.