Turn the AC power and battery power switches, in the pump control unit located in the upper
righthand corner of the power supply, to the ON position (up).

4

Place the system override switch for Hose 1 in the MAN (manual) position.

5

Turn on Hose 1. After completing reset, the hose should be able to dispense product.

6

Turn on all other hoses. No other hoses besides 1 should activate.

7

Turn off all hoses.

8

Place the system override switch, for Hose 1 in the ON position.

9

Repeat steps

4

through

8

for all remaining hoses. Substitute the hose number being tested for

hose 1 until all hoses have been tested.

10

Replace all connectors and reassemble.