beautypg.com

12 vdc measurement, 9 vdc measurement – Gasboy Site Controller III Start-Up User Manual

Page 77

background image

MDE-4375 CFN Series Site Controller III Start-Up Manual · June 2005

Page 65

DC Power Measurement and Adjustment

6

Disconnect the meter probes.

7

Turn the AC POWER switch off and return the power supply cover to its normal location.

8

Turn the AC POWER switch back on.

+12 VDC Measurement

Locate TP3 (+12VDC) on the CPU PCB; measure the +12 VDC between TP3 (+) and TP2
(gnd) on CPU PCB.
The voltage should be +11.00 to +14.00 VDC.
Note: This voltage is not adjustable.

-12 VDC Measurement

Locate TP4 on the CPU PCB; measure the -12 VDC between TP4 and TP2 on the CPU PCB.
Voltage should be -11.00 to -14.00 VDC.
Note: This voltage is not adjustable.

+9 VDC Measurement

1

Locate TP5 on the CPU PCB; measure the +9VDC between TP5 and TP2 on the CPU PCB.
Voltage should be +6.00 to +10.00 VDC.
Note: This voltage is not adjustable.

2

Turn off power to the console and carefully set the upper half of the console on the lower half.

3

Replace the four screws in the bottom of the unit.

4

Turn on the power.