287

Figure 230. Sensing Transformers Settings Screen

Table 93. Sensing Transformers Settings

Setting

Range

Increment

Unit

Default

Phase/Ground CT Ratio

1 to 50,000

0.01

turns

ratio

1

Unbalanced Calculation Mode

I2/I1 or Average

n/a

n/a

I1/I2

CT Connection

WYE, DAB, or DAC

n/a

n/a

WYE

CT Source

CT1 or CT2

n/a

n/a

CT1

Phase VT Ratio

1 to 10,000

0.01

turns

ratio

1

Phase VT Connection

AB, BC, CA, AN, BN, CN, 3W-D,

or 4W-Y

n/a

n/a

4W-Y

27/59 Mode

PP or PN

n/a

n/a

PN

27R Mode

PP or PN

n/a

n/a

PN

Aux VT Ratio

1 to 10,000

0.01

turns

ratio

1

Aux VT Connection

AB, BC, CA, AN, BN, CN, or

Ground

n/a

n/a

AN

Transformer Setup

The BE1-11t requires information about the transformer windings to provide differential metering and
differential protection. See the

Phase Current Differential (87) Protection

chapter for more information.

Transformer setup is accomplished on the Sensing Transformers settings screen (Figure 231) in
BESTCOMSPlus. Setting ranges and defaults are summarized in Table 94.

BESTCOMSPlus Navigation Path: Settings Explorer, System Parameters, Transformer Setup

HMI Navigation Path: Settings Explorer, System Parameters, Transformer Setup

BE1-11t

Configuration