Transformer setup – Basler Electric BE1-11t User Manual
Page 299
9424200995 Rev H
287
Figure 230. Sensing Transformers Settings Screen
Table 93. Sensing Transformers Settings
Setting
Range
Increment
Unit
Default
Phase/Ground CT Ratio
1 to 50,000
0.01
turns
ratio
1
Unbalanced Calculation Mode
I2/I1 or Average
n/a
n/a
I1/I2
CT Connection
WYE, DAB, or DAC
n/a
n/a
WYE
CT Source
CT1 or CT2
n/a
n/a
CT1
Phase VT Ratio
1 to 10,000
0.01
turns
ratio
1
Phase VT Connection
AB, BC, CA, AN, BN, CN, 3W-D,
or 4W-Y
n/a
n/a
4W-Y
27/59 Mode
PP or PN
n/a
n/a
PN
27R Mode
PP or PN
n/a
n/a
PN
Aux VT Ratio
1 to 10,000
0.01
turns
ratio
1
Aux VT Connection
AB, BC, CA, AN, BN, CN, or
Ground
n/a
n/a
AN
Transformer Setup
The BE1-11t requires information about the transformer windings to provide differential metering and
differential protection. See the
Phase Current Differential (87) Protection
chapter for more information.
Transformer setup is accomplished on the Sensing Transformers settings screen (Figure 231) in
BESTCOMSPlus. Setting ranges and defaults are summarized in Table 94.
BESTCOMSPlus Navigation Path: Settings Explorer, System Parameters, Transformer Setup
HMI Navigation Path: Settings Explorer, System Parameters, Transformer Setup
BE1-11t
Configuration