5 poe schedule – Interlogix NS3550-2T-8S User Manual User Manual
Page 320

IFS NS3552-8P-2S AND NS3550-2T-8S User Manual
320
4.16.5 PoE Schedule
The PoE Schedule of the NS3552-8P-2S features two advanced PD power control functions:
PD power ON/OFF Schedule
Schedule Power Recycle
PD Power ON/OFF Schedule
Under the trend of energy saving worldwide and contribute to environment protection on the earth, the NS3552-8P-2S can
effectively control the power supply besides its capability of giving high watts power. The “PoE schedule” function helps you to
enable or disable PoE power feeding for each PoE port during specified time intervals and it is a powerful function to help SMB or
Enterprise save power and money.
Schedule Power Recycle
The NS3552-8P-2S allows each of the connected PoE powered device to reboot in a specific time each week. Therefore, it will
reduce the chance of powered device crash resulting from buffer overflow.