Gasboy CFN III V3.6 and Later User Manual
Page 57

MDE-4739A CFN III PCI Secure Controller Software Installation/Upgrade Instructions · July 2010
Page 51
Modular Profit Point
Installation
21
Remove the CD-ROM and reconnect the COM 1, 9-pin connector for CFN III
communications.
22
Click Finish or press Enter to reboot the Profit Point tower.
This completes the Profit Point software installation. The Profit Point must automatically load
on boot up and connect normally to the CFN III.
Note: If the above instructions were not followed properly the keyboard and mouse will not
function. If this occurs then the Profit Point tower must be turned off with the power
switch on the back. When power is restored to the tower the keyboard and mouse must
resume normal operation. It is advised to reload the Modular Profit Point software and
perform a new installation.
23
Display changes, Sign On, and Password keys can be created. A new Master.plu file can be
created if one was not restored or a proper backup was not made. For more information, refer
to
“Setting Up the PLU Data File”
on