Selecting components – Gasboy CFN III V3.6 and Later User Manual
Page 42

Installation
Installing/Upgrading the PCI-compliant CFN III and Integral Profit Point Software
Page 36
MDE-4739A CFN III PCI Secure Controller Software Installation/Upgrade Instructions · July 2010
Selecting Components
5
The Gasboy Installation window will appear after a few moments. You must use scroll bar.
Click Install.
6
Warning window appears about the “Setup.bat file”. Select the Open it and Always ask
before opening this type of file check box. Click OK, and the CFN install wizard will be
launched.
7
Welcome window for the CFN III Setup program appears. Read the warnings in the window
and then confirm by clicking Next to continue the install.
Note: Click Cancel to exit the install program.
8
User Information window appears. Change the user information, Name, and Company to one
that is appropriate for the location. Click Next.
9
Select the Components to be Installed: by selecting the check box in front of the component
name.
a
Select the check box for “CFN III software”.
b
Select the check box for “Profit Point only for an Integral Profit Point”.
c
Click Next to continue.
10
Check Setup Information window is used for verification of the selection made in the previous
windows. If this does not represent the required selection(s), click Back and make the required
changes. Click Next to accept your selection(s).
11
Preserve the current CFN information (upgrade only). It is recommended that you preserve the
files before installing the newer version. Click Yes.
Installing the First Phase of Gasboy PCI-complaint Software
12
Transferring CFN Programs status box followed by Transferring Online Documentation
window appears and the software selected in step
will be installed.
13
Setup Need the Next Disk window with the path default location “A:\” appears. Verify the
“Customer Disk” is installed in the A: Drive. This must have been done in step
on
.
Click OK.