New pc loop application kits, Floppy disk backup, Perform the – Gasboy CFN III V3.6 and Later User Manual
Page 22: Floppy disk, Backup, Important information

Installation
Floppy Disk Backup
Page 16
MDE-4739A CFN III PCI Secure Controller Software Installation/Upgrade Instructions · July 2010
New PC Loop Application Kits
If the CFN III current version is 3.3H or later, it is advised that new PC Loop Applications Kits
be installed before the upgrade to Windows XPE and version 3.6 or later. This will allow any
issues that arise to be resolved, before the upgrade.
The following must be verified before installing the PC Loop Applications:
• Ensure that you have the installation manual(s) for the new kits to be installed, onsite.
• Ensure that you have read and understood the installation and setup requirements.
• Ensure that you have arrived with the necessary shielded wiring of sufficient length, if
current site wiring does not meet the new kit wiring specification.
• Installation of the new kits may require dispenser reprogramming or jumpers to be
correctly set. Ensure that the ASC doing the upgrade is qualified to perform the tasks for
the fueling points onsite.
• The ASC must ensure that the dispensers and card readers onsite are running the current
manufacturer’s software release versions before installing the new PC Loop Applications.
This may require additional parts or software not listed in this manual.
Floppy Disk Backup
This procedure is required for a Windows NT reimage to Windows XPE OS and is
recommended for all version 3.6 upgrades. The user must be logged on as “XP Administrator”
for upgrades. While this may look like an extensive process, for a knowledgeable technician
the backup procedure will only take about 15 minutes.
Verify the following before beginning the backup procedure:
Note: Exception: SC3 Configuration Report can be run as soon as you arrive onsite. Refer to
“Print an CFN III Configuration Report”
on
.
• Site is closed.
• All sales are completed and receipts have been printed.
• The STOP command has been issued to prevent any new sales.
• The Shift and Day Close processes are completed and the reports are printed.
• All transactions have been polled from the site (if applicable)
• The network settlement has been completed and verified
Perform a SYSBACK command to backup the CFN III system data.
Perform a TRANBACK command to backup the CFN III current transaction file.
IMPORTANT INFORMATION
Note: Transactions backup from an CFN III version 3.4 or earlier system cannot and must not
be restored to a PCI-compliant system.