Example of scheduled eject of media, Schedule the report group – HP B6960-90078 User Manual
Page 744

Further Information
Example of Scheduled Eject of Media
Appendix A
A-14
Example of Scheduled Eject of Media
You might want to eject all media that were used for backup during the
night every morning at 6.00 AM. To schedule such an operation proceed
as follows:
Schedule the Report Group
1. In the Data Protector GUI, select
Reporting
.
2. In the Scoping Pane expand
Reporting
and right click
Reports
.
Select
Add Report Group
. The
Add Report Group
wizard is
displayed.
3. In the wizard, name your report group and click
Next
. The Data
Protector Scheduler is displayed.
4. In the Scheduler, select the starting day and click
Add
. In the
Schedule Report Distribution
dialog window, specify the hour,
and that the report is to be generated daily. Click
OK
and then
Finish
.
The Report Group is now scheduled. Now you can add the report to it.
Add the Report to the Report Group and Configure It
1. In the
Add New Report Wizard
, select
Reports on Media and
Pools
.
2. Select the
List of Media
type and name the report. Click
Next
.
3. To eject all media, regardless of media pool and location leave all
fields set to default settings. Click
Next
four times.
4. Select the
Relative time
and specify
8
for
Started within last
hours
and
8
for
Duration hours
text boxes respectively. This will
cause only the media that were used for backup in the last eight
hours from the point of starting a report to be listed in the report.
Click
Next
.
5. In the
Format
and
Send
text boxes, select
Tab
and
External
,
respectively. In the
Script
text box, provide the name of the script
(HP-UX and Solaris systems) or the batch file containing the
command that starts the script (Windows systems). The script is