beautypg.com

Example of scheduled eject of media, Schedule the report group – HP B6960-90078 User Manual

Page 744

background image

Further Information

Example of Scheduled Eject of Media

Appendix A

A-14

Example of Scheduled Eject of Media

You might want to eject all media that were used for backup during the
night every morning at 6.00 AM. To schedule such an operation proceed
as follows:

Schedule the Report Group

1. In the Data Protector GUI, select

Reporting

.

2. In the Scoping Pane expand

Reporting

and right click

Reports

.

Select

Add Report Group

. The

Add Report Group

wizard is

displayed.

3. In the wizard, name your report group and click

Next

. The Data

Protector Scheduler is displayed.

4. In the Scheduler, select the starting day and click

Add

. In the

Schedule Report Distribution

dialog window, specify the hour,

and that the report is to be generated daily. Click

OK

and then

Finish

.

The Report Group is now scheduled. Now you can add the report to it.

Add the Report to the Report Group and Configure It

1. In the

Add New Report Wizard

, select

Reports on Media and

Pools

.

2. Select the

List of Media

type and name the report. Click

Next

.

3. To eject all media, regardless of media pool and location leave all

fields set to default settings. Click

Next

four times.

4. Select the

Relative time

and specify

8

for

Started within last

hours

and

8

for

Duration hours

text boxes respectively. This will

cause only the media that were used for backup in the last eight
hours from the point of starting a report to be listed in the report.
Click

Next

.

5. In the

Format

and

Send

text boxes, select

Tab

and

External

,

respectively. In the

Script

text box, provide the name of the script

(HP-UX and Solaris systems) or the batch file containing the
command that starts the script (Windows systems). The script is