2 bcm wiring connections to aerco xpc gateway, 1 bcm wiring connections to xpc port 2, Gf-122 aerco xpc gateway – AERCO XPC GATEWAY Communications User Manual
Page 65

GF-122 AERCO XPC GATEWAY
65
7 6 5 4 3 2 1
Y2
Y2
Y3
Y4
Y1
SW1
A1
I
0
M
O
D
B
US
A
(
-)
M
O
DB
US
B
(
+
)
BCM FRONT VIEW
Figure 4-2. BCM Modbus (RS485) Connections
4.2 BCM WIRING CONNECTIONS TO AERCO XPC GATEWAY
XPC Port 2 is normally used to connect to AERCO equipment, except when the controlling BAS is
utilizing a LonWorks SLTA module, or communicating via BACnet PTP. In this case, Port 1a of the XPC
must be used to connect AERCO equipment. Therefore, follow the appropriate wiring instructions in
subsection 4.2.1 (Port 2) or 4.2.2 (Port 1a) as applicable.
4.2.1 BCM Wiring Connections to XPC Port 2
When the controlling BAS is utilizing BACnet MS/TP, Johnson N2 or LonWorks protocol without an
SLTA, use XPC Port 2 as follows:
1. On the XPC Gateway, position the EIA-232/EIA-485 and 2W/4W jumpers to EIA-485 and 2W
respectively as shown in Figure 4-3.
EIA-485
EIA-232
2W
4W
- AERClean (12 pages)
- ProtoNode Gateway Rev 1 (with internal LEDs) (64 pages)
- ProtoNode Gateway Rev 3 (with external LEDs) (126 pages)
- Control System (ACS) (144 pages)
- Belimo F6...HD/HDU Series Valve (44 pages)
- Belimo AF120-S US Actuator (9 pages)
- Belimo AMX24-MFT Actuator (9 pages)
- Belimo GKX24-MFT Actuator (9 pages)
- Belimo Motorized Valves Installation (20 pages)
- BMS II BOILER (108 pages)
- BMS II BOILER MODBUS Communication (100 pages)
- BMS 168 (86 pages)
- Boiler Valve Controller (BVC) PRIOR to Serial-12-840-1 (35 pages)
- Boiler Valve Controller (BVC) (38 pages)
- Buffer Tanks (14 pages)
- Combination Control Panel (CCP) (4 pages)
- Domestic Water Storage Tank (19 pages)
- Steam Traps (6 pages)
- X100 – Inhibitor (4 pages)
- AM Series Boiler User Manual (156 pages)
- AM Series Boiler Cascade Sequencer Controller (26 pages)
- AM Series Boiler Modbus Interface Manual (18 pages)
- BMK 1.5 LN October 2012 (166 pages)
- BMK 1.5 LN July 2011 (152 pages)
- BMK 1.5 LN June 2010 (123 pages)
- BMK 1.5 LN May 2009 (111 pages)
- BMK 1.5 LN Dual Fuel Feb 2013 (162 pages)
- BMK 1.5 LN Dual Fuel June 2010 (139 pages)
- BMK 1.5 LN Dual Fuel Jan 2009 (126 pages)
- BMK 1500-2000 (188 pages)
- BMK 1500DF (196 pages)
- C-More Control Panel (162 pages)
- BMK 2.0 LN October 2012 (172 pages)
- BMK 2.0 LN Natural Gas (SN G-11-1861 and above) (170 pages)
- BMK 2.0 LN Nat. Gas June 2010 (125 pages)
- BMK 2.0 LN Natural Gas 2008 (111 pages)
- BMK 2.0 LN Nat. Gas for Mass. only (113 pages)
- BMK 2.0 LN Dual Fuel Serial G-11-2402 and UP (160 pages)
- BMK 2.0 LN Dual Fuel Nov 2010 (139 pages)
- BMK 2.0 LN Nat. Gas (112 pages)
- BMK 2.0 LN for Mass. only (114 pages)
- BMK 3.0 LN Dual-Fuel Series Gas Fired Low NOx Boiler System (136 pages)
- BMK 3.0 LN Natural Gas July 2011 (129 pages)
- BMK 3.0 LN Nat. Gas Jan 2011 (129 pages)